Case Study: A 1,200 sf Detached ADU, Three Schemes

Case study: 1,200 sf detached ADU, Scheme C, by YDS Architects
← ResourcesJul 17, 20232 min read

Updated October 2026

One lot, a size cap and a height cap. We tested three ways to fit a detached ADU the owner could live in or rent, and priced the simplest one.

The short version

  • Site: a single-family lot with an existing garage, also eligible for SB 9.
  • Constraint: ADU limited to 1,200 sf and 16 ft high under the rules that applied at the time. The owner wanted about 1,000 sf.
  • Design move: three schemes, from a one-bedroom garage conversion to a two-level, three-bedroom layout.
  • Result: our ROI study for the conversion estimated a net construction cost of about $231,000 after grants and a break-even near 5.7 years.
Initial 3D render of the detached ADU
Detached ADU case study. Initial 3D render.

The site and the constraint

The 16 ft height limit kept a detached ADU to one story. SB 9 eligibility opened a second path: a second primary unit, not an ADU, under the zone’s own height limit. The question was how much home each path could hold, and at what cost.

The design moves

Scheme A, garage conversion. Turn the existing garage into a one-bedroom ADU. Open kitchen and living, windows placed for daylight, a small private yard. Lowest cost, fastest path.

Scheme A floor plan, one-bedroom garage conversion ADU
Scheme A. One-bedroom garage conversion, floor plan.

Scheme B, two levels with an upper suite. Living on the ground floor, a private primary suite with its own bath upstairs. A unit for a couple or small family.

Scheme B axonometric, two-level ADU with upper primary suite
Scheme B. Two levels, primary suite upstairs.

Scheme C, two levels with more bedrooms. Scheme B’s section plus two bedrooms on the ground floor, each with its own small garden for privacy. The most rentable layout.

Scheme C axonometric, two-level ADU with three bedrooms and private gardens
Scheme C. Upper suite plus two ground-floor bedrooms with private gardens.

The result

We gave the owner three priced options instead of one guess. Scheme A wins on cost. Schemes B and C go to two levels and house more people. Our ROI study for Scheme A estimated the net cost above after grants, with a break-even near 5.7 years. These were projections at the time of design, not results.

Rules have changed since. A detached ADU can now reach 18 ft within a half mile of major transit, and an attached ADU up to 25 ft. Check current limits for your lot.

How we use it

We still start every lot this way: test the options side by side, then price them. On larger lots that often points past an ADU. At Foothill Residence we stacked a 2-bed unit with a garage under the main home. At Mariposa Complex in Altadena, SB 1123 let us place three homes on one shared driveway. See SB 684 / SB 1123.

Have a lot in mind?

Send us the address and we’ll tell you what it can hold. Book a free consultation → · Follow @ydsarch on Instagram

Picture of Yifu Pan

Yifu Pan

Yifu Pan, founder and principal architect of YDS Architects, is revolutionizing SoCal architecture. With a Master’s degree from USC, a decade of experience, and a deep understanding of architectural design, he provides high-quality, family-centered solutions. His commitment to affordable housing and community-beneficial commercial spaces showcases his passion for design.

Leave a Reply

About YDS Architects

YDS Architects is a Los Angeles architect collective of designers, permit expediters, and planners specializing in modern residential and commercial design across Southern California — including ADUs and multifamily housing.

Los Angeles Fires Resources

Mariposa Residence, Altadena, by YDS Architects
Planning a rebuild or a new project? Book a free consultation · 626-660-0206

Recent Posts

Follow Us

Get a free consult with a Los Angeles architect.

Start a project →or call 626-660-0206 · info@ydsarch.com
Scroll to Top